Capture the tender
One pass over the tender produces a structured register — reference, discipline, mandatory flag and source page.
| Ref | Discipline | Text | Page |
|---|---|---|---|
| 3.1 | mechanical | HVAC for all occupied floors per ASHRAE 62.1. | 3 |
| 4.2 | electrical | LV distribution with N+1 redundancy on risers. | 4 |
| 5.4 | elv | Structured cabling Cat6A to every workstation. | 5 |
A hand-built mock in the site theme, modelled on the real screen and populated with our demo tenant's data — not a screenshot. Hover to pause.
More in Capture the tender
Upload the RFP and EstiWright pins the tender number, page count and source file before anything else happens.
Every requirement carries an explicit mandatory flag, so nothing binding is left to memory.
Requirements are tagged ICT, CCTV, Voice, SCS, ACS, AV, IPTV, GRMS or UPS so each package owner sees only theirs.
We'll run your RFP through the same pipeline and show you the output.